What is the assumed load considered for heavy applications per meter?

Study for the BICSI Outside Plant Designer Exam. Enhance your knowledge with flashcards and multiple choice questions. Each question includes detailed explanations and hints. Ace your exam with confidence!

In the context of Outside Plant (OSP) design, heavy applications typically involve the installation and support of large telecommunication cables and infrastructure that require robust support to prevent damage and ensure safety. The standard assumed load for these applications is critical in determining the design parameters for poles, conduits, and other supporting structures.

The correct answer, which indicates an assumed load of 1500 pounds per meter, reflects the significant weight and stress that can be expected from heavy applications like fiber optic or copper cable installations, especially over long spans or in environments that experience heavy winds or other loads. This benchmark is essential for ensuring that the supporting infrastructure can adequately handle the weight and any dynamic forces that may act upon it, hence maintaining the longevity and reliability of the installation.

Understanding this load is vital for engineers and designers when planning installations, as it directly impacts material selection, spacing of supports, and overall structural integrity. Using the correct loading assumptions helps prevent failures that could arise from underestimating loads, ensuring safety and performance standards are met in the deployment of outside plant facilities.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy